Notice of road work in Ellington

Ellington - posted Jul, 31 2013

The town of Ellington’s Department of Public Works will be starting road work on Hayes Ave., Hillsdale Drive and Field Drive on Aug. 6. This work will consist of milling off the top two to three inches of pavement followed by the repair and installation of the existing drainage system along with the adjustment and repairs to the sanitary sewer manholes. When all is completed, the roadway will be repaved. Milling of the existing pavement is done to bring back some curb reveal that will allow runoff to stay along the road’s edge and into the catch basins. This will take place as planned, weather permitting. Please do not park in or on the road starting Monday morning, Aug. 5. After the paving is completed, the contractor will have a crew back within a week to make corrections to the driveway aprons that have been affected by the road work. Should residents have questions or concerns, please contact the Public Works Department at 860-870-3140.


Home
Let us know what you think!
Please be as specific as possible.
Include your name and email if you would like a response back.
CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
z
K
P
n
M
N
Enter the code without spaces and pay attention to upper/lower case.